Straight answers
Zero Tolerance Snow Contracts: What They Mean and How to Price Them
What zero tolerance means
In a snow contract, zero tolerance usually means the contractor keeps the property clear whenever any snow or ice builds up, instead of waiting for a trigger depth such as 5 cm. The wording is not standard. One manager means any accumulation on the walks. Another means the whole lot, fire routes included. The definition has to be in the contract in plain terms, because the term on its own settles nothing.
Why a manager asks for it
Ontario's Occupiers' Liability Act gives an injured person 60 days to give written notice of a slip-and-fall on snow or ice. A zero tolerance clause is meant to leave as little untreated snow and ice on the property as possible, and a service log gives the owner a record of what was done and when. It lowers exposure. It does not remove it.
What it changes in the price
A lower trigger means more visits in a normal winter. Salting is a bigger share of the work, because ice is treated as it forms. Opening-time requirements, the size of the lot and the number of entrances all move the number. Because the visit count is hard to predict, zero tolerance work is often priced per visit or as a hybrid, with flat plowing and salting per application, rather than one flat seasonal number.
Clauses to get in writing
The trigger, stated in centimetres, and what counts as an accumulation. The surfaces in scope, by name: walkways, entrances, ramps, fire routes, lot aisles. Salting: per application or included, and where. Where snow is stacked and what happens when the lot runs out of room. What the service log records and who receives it. A certificate of insurance delivered before the season. And what the contractor will actually do, stated as an action, not as a time nobody can hold in a storm.
What we will and will not write in
We quote commercial work after a site walk, with the trigger, salting terms and service log written into the contract. Whether a zero tolerance clause can be quoted for your property is decided at the walk. We do not write in clear-by times or round-the-clock monitoring promises, and a quote that does should be asked how it will be kept.
Related questions
- Is zero tolerance the same as a 24/7 contract?
- No. Zero tolerance describes the standard the property is kept to. A 24/7 term describes when the contractor is reachable. Ask for each to be defined separately.
- Does zero tolerance mean the lot is never snow-covered?
- No. Snow keeps falling during a storm. The clause sets how soon after accumulation the contractor works the property, so read how it is worded.
- Can one contract cover several buildings?
- Yes. A portfolio contract carries a scope sheet and a service log for each site, with one monthly summary. See the property management page.